![]() |
|||||||
|   | |||||||
|   |   | PROJECTS |
  |
|
  Ravi Bridge near Thein Dam, Punjab |
Ravi Bridge near Thein Dam, Punjab Superstructure design, precambering calculations and technical specifications for the 165 m long 3span (32.5 m + 100 m + 32.5 m) prestressed cast-in-situ concrete continuous bridge constructed by cantilever construction techniques for the Ranjit Sagar Dam Authorities. The anchor (side) spans are first concreted on ground supported formwork before constructing the main span. In collaboration with M/s RITES.
|   | |
|   |   |
  |
  |
|
Airoli Bridge Across Thane Creek, Bombay Quality Audit for the work of construction of the major bridge across Thane Creek connecting Bombay to New Bombay for M/s CIDCO. The 6-lane facility with footpaths consists of a 30.0m wide deck and a length of 1030m (19*50m + 2*40m). |
  | ||
|   |   |
  |
  |
Road Overbridge at Airoli, New Bombay |
Road Overbridge at Airoli, New Bombay Complete design consultancy services for the R.O.B across Kalwa-Turbhe Railway line and Thane Belapur Road for M/s CIDCO. Acute site constraints and complex highway geometrics characterise the projects proposed with prestressed hollow-core continuous superstructure. |
  | |
|   |   |   |   |
| More projects--> |
|
|