|   |
  |
PROJECTS |
  |
 
Siolim Chopden Bridge, Goa
|
|
Siolim Chopden Bridge, Goa
Structural design and technical co-ordination with
MOST for the project consisting of a 24.0 m wide deck in RCC T-Beam /
Slab superstructure of 16.0m span for Goa PWD. Four well foundations
of 7.0 m dia are designed to be sunk simultaneously down to rock level
at 20m below bed level.
|   |
|   |
  |
  |
  |
Bailpar Bridge, Goa
|
|
Bailpar Bridge, Goa
Proof Consultancy for the project consisting of
5*16.0m span RCC T-Beam/Slab superstructure for a two-lane carriageway
for Goa PWD. Open foundations rest on rock at significant depths.
|
  |
|   |
  |
  |
  |
Sonal Bridge, Goa.
|
|
Sonal Bridge, Goa.
Proof Consultancy for the 160m long bridge which
has simply supported spans of 26.6m for Goa PWD. The superstructure
consists of a pi-shaped section while the foundations are with bored
piles seated into rock.
|
  |
|   |
  |
  |
  |